Sep 21, 2020

Myosis Monday

myosis ~ excessive contraction of the pupil of the eye

The hubby and I have officially lost our minds. But on the other hand, at least I won’t be lacking for something to talk about on my blog for the foreseeable future.

Our kitchen is small and lacking in counter/storage space, and we’ve been talking for a long time about how some day we’d have something done to fix it. Well, that some day is now. We met with a designer at Home Depot who is unable to use a shoehorn to give us more space in the kitchen, but he did have some good ideas of what/where new cupboards will work to make it more efficient.

I guess I’ve been watching too much HGTV because when I hear “kitchen reno” I think they’re going to do it all – design it, rip out the old cupboards, do the walls, put up the new cupboards. But that is not how it works, apparently. What the designer does is help you pick out the cupboards that will work in the space you have, and order them for you (as well as the countertops and any appliances you may need). Then he’ll put you in touch with the contractor to install them.

I was prepared for having to empty out all the junk from the old cupboards, in fact I’ve been looking forward to it because I figure I’ll be able to get rid of a lot of stuff we don’t use. That alone will help with the storage issue. But I didn’t figure on having to rip the old cupboards/counters out ourselves.

And we were already planning on redoing the flooring in the kitchen, which has to wait until the old cupboards are ripped out, but it never occurred to me we’d have to deal with the walls ourselves too. The old paper has to be stripped off and the walls sanded and repainted before the new cupboards can go up. Which begs the question, just how long are we going to be without cupboards??

The fridge and stove are staying where they are, but the dishwasher is being moved and the sink replaced – also something we need to take care of ourselves. The new cupboards have to be installed before the countertops, but at least the installation for the counters is included in the price of the stone.

But . . . while we’re waiting for the cupboards and counters to arrive, the hubby decided it’s time to do something about our damp, smelly, barely used basement. Which is not going to be nearly the job the kitchen is and it’s something he can do himself.



He started with ripping up the old, disgusting carpet and he’s made arrangements for someone to come and take the furniture away. The cats spent many years having a spraying war down there, so you can imagine what it smells like, despite our efforts at controlling it.

So one of the things hubby is doing is using this special stuff on the cement to kill the odor/bacteria, then he’s installing a special subfloor with vinyl flooring on top of that. The finishing touch will be new furniture.

Once the hubby sinks his teeth into a project it’s full steam ahead until it’s done – he should have the rec room done in no time at all. The kitchen however . . . well, that’s a whole other kettle of fish.

No comments: